
AEO scope of work:
Rehabilitation and operation of the largest potable integrated filtration water station in AL_SIDQ region with capacity of 300 cubic meter per hour.
Rehabilitation and operation of an integrated potable filtration water station in AL-SIDQ region, with a capacity of 100 cubic meters per hour.
Supply, and installation of backup power generation units with suitable capacities for each of the upgraded water stations.
Design and construction of a water pipeline to connect the water station in AL-SIDQ region and integrate it into the existing network.